01 / GUIDE
Measure the installation route
Record ECU position, connector endpoints, branch lengths and service loops. Plan around heat, moisture, vibration and moving parts before selecting sleeve and connector requirements.
02 / GUIDE
Keep the pin map traceable
Use a worksheet linking connector ID, cavity number, signal name and wire label. Note whether a drawing shows the mating face or wire-entry side; the viewing direction can change the apparent layout.
03 / GUIDE
Follow the correct grounding diagram
Distinguish power grounds, sensor returns and shields using the exact ECU manual. Avoid transferring a grounding layout from a different model simply because the connector looks similar.
04 / GUIDE
Define inspection and delivery records
Request the final pin map, connector list and agreed continuity-check record with the harness. Identify which terminations remain for the installer and which connections are supplied complete.
Checklist & example
- Vehicle: market / year / model. Engine: code and any swap.
- Original ECU: part number. Target ECU: model and hardware revision.
- Wiring: both connector faces and pinout. Retained functions: list individually.


